    QUEENSLAND · ANSWER

    How long does a handover inspection take and when do I get the report?


    A handover (PCI) inspection usually takes between 1 and 4 hours on site, depending on the size and complexity of the home. A compact single-storey home is at the shorter end; a large two-storey build with multiple wet areas takes longer because there's simply more to check properly.

    When you get the report

    You get the full report the same day. It's a digital report you can open on your phone or computer and forward straight to your builder — no waiting days for a posted document. Every defect is listed as a Builder's Action List item with a photo, the location, and the relevant standard where one applies, so there's no ambiguity about what needs fixing.

    What the inspection covers

    A QBCC-licensed builder-inspector carries out the inspection in person and goes through the whole home — inside and out, the roof space and roof exterior where safe to access, the wet areas, and the site around the building. You're welcome to be there at the end for a walk-through of the findings.

    Because the report lands the same day, you've got time to get the items back to your builder before settlement while they're still responsible for the repairs.

    Book your handover inspection online or call 07 3180 8041.

    Frequently asked questions

    Do I get the report on the day?

    Yes. The full digital report, with a photo of every defect, is delivered the same day so you can forward it to your builder straight away.

    Can I attend the inspection?

    Yes — you're welcome to join the inspector at the end for a walk-through of the findings before the written report arrives.