Over 100 five-star Google reviews
    07 3180 8041
    All defectsHANDOVER · BATHROOM

    Open wall and missing tiles behind a floating vanity

    We get down low in every bathroom, because that's where things get missed.

    What it is

    An open hole in the wall, exposed pipes and missing tiles hidden under a floating vanity.

    Why it matters

    In a wet area it's a path for water into the wall cavity, and it's unfinished work.

    How we check it

    We look under and behind every vanity with a torch.

    The fix

    Close up the wall, seal the penetrations and finish the tiling.

    How common it is

    We get down low in every bathroom, because that's where things get missed.

    What this means for your home

    The wall behind a vanity, laundry tub or fridge recess is a favourite place for a builder to leave unfinished — no paint, bare plaster, a gap at the floor — because it is hidden the moment the fixture goes in. But hidden is not the same as finished: an unpainted or unsealed wall in a wet area has no moisture protection, and the QBCC guide expects surfaces to be completed. At handover, before the vanity is plumbed in for good, it is a quick paint and seal. Once the cabinetry, the plumbing and your toiletries are in place, reaching that wall means pulling the whole fitting out. We look behind and under every fixture we can access, and photograph unfinished, unpainted or unsealed areas so they are completed while they are still reachable. The unfinished areas are photographed from behind and under the fittings so there is no doubt the builder left them incomplete. Hidden surfaces are exactly where corners get cut, which is why we make a point of looking behind every fixture we can access. A quick paint and seal now, before the vanity is plumbed in for good, is far easier than pulling the whole fitting out later to protect a wall that should have been finished.

    Where we check for this

    Call Book